C3W was retained by the City of Guelph for the conceptual design for a two-phase upgrade being completed at the F.M. Woods WTP.
The first phase of the project involves converting the original pump station facility (ca.1879), which was designated as a City Heritage property in 1997, into office space for technical services and conservation staff. The second phase of the project will see the construction of a replacement 1050 L/s pump station and wet well, replacement of the electrical power supply and distribution system, refurbishment of existing O&M facilities, construction of a new administration building and associated controls upgrades.
Continue reading “F.M. Woods WTP Upgrades” →
Gas chemical system safety reviews were completed by C3W in 2014 for the ozone, liquid oxygen, chlorine gas and ammonia gas systems at the Mannheim WTP. This led to the creation of a capital project to affect the recommended upgrades. C3W won a competitive bid in 2017 to provide design and construction support services to implement the capital project.
Continue reading “Mannheim WTP Gas Chemical System Upgrades” →
The Terms of Reference for the Assessment of Groundwater
Systems Potentially Under the Influence of Surface Water (GUDI-TOR) and the
Ministry of the Environment and Climate Change (MOECC) Procedure for
Disinfection are in the process of being updated to address the federal
requirement for groundwater disinfection, which is now 4-log virus
inactivation. Detailed investigations
into the level of disinfection achieved at Region of Waterloo (Region) supply
wells, system wide, were carried out by C3 Water Inc. (C3W).
Continue reading “Region of Waterloo- Design and Construction Services for Region Well Supply Disinfection System Upgrades” →
In 2015 the Region of Waterloo
(RMOW) required assistance for design and construction services for the
implementation of an alternative reservoir fill piping arrangement at the St.
Jacobs booster pumping station and reservoir facility. The facility boosts
pressures for the supply of water to St. Jacobs and Elmira from the Waterloo
pressure zone. The original reservoir fill line, installed in the 1990s,
conveyed water to the reservoir through a globe style control valve. Due to the
existing piping arrangement maintenance of the valve (and replacement) required
a complete shutdown of flows into the reservoir.
Continue reading “Region of Waterloo- St. Jacob’s Booster Pumping Station & Reservoir Inlet Piping Upgrades” →
The Township of Centre Wellington (Township) hired C3 Water Inc. (C3W) to assist with the review of treatment strategies for the Township’s Well FPH1 Facility. Concentrations of trichloroethylene (TCE) exceed the Provincial Maximum Acceptable Concentration (MAC) in the Township’s Well FPH1 raw water.
Continue reading “Centre Wellington- Well FPH1 CO2 Injection System Implementation (Phase 3)” →
The Region of Waterloo hired C3 Water to assist in developing a Water Services specific process flow diagram (PFD) and process and instrumentation diagram (P&ID) standard. Standard development proves very useful in the design of new facilities, upgrades, expansions and maintenance of existing water infrastructure. The standard provides a consistent representation of the current water services system and leads to an increased understanding and knowledge of the Region’s water supply and treatment processes and facilities.
Continue reading “Region of Waterloo- P&ID Standard Development” →
In
2015, City of Guelph Water Services identified the need for a replacement
sodium hypochlorite system at the FM Woods Water Treatment Plant. The FM Woods
WTP constitutes the largest supply of water to the City and as such its
operational reliability is extremely important. The existing sodium
hypochlorite dosing system, installed in 2005, consisted of PVC piping complete
with glued joints and was prone to leaks. In addition the existing diaphragm
metering pumps are prone to solids buildup and required frequent maintenance.
Continue reading “City of Guelph- FM Woods Sodium Hypochlorite System Upgrade” →